Catalogue / Electrical safety audits
Statutory electrical compliance audit, Pro 5 seriesSample
by Kaverispark Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaverispark Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Statutory electrical compliance audit from Kaverispark, Pro 5 series: 4 installed load options between 1 MVA and 25 MVA. Key features: training recommendations for staff, fire exit and detection checks and compliance matrix against CEA safety rules. Typically used for manufacturing plants, hospitals and commercial buildings and solar and wind sites. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaverispark
- Model
- KAV-752 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVAKAV-752-01 | Installed load: 1 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load5 MVAKAV-752-02 | Installed load: 5 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load10 MVAKAV-752-03 | Installed load: 10 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load25 MVAKAV-752-04 | Installed load: 25 MVA | 1 site · Report in 7-14 days | on quote |
Specifications
| Installed load | 1 MVA to 25 MVA (see variants) |
|---|---|
| Scope | Audit with measurements |
| Auditor | CEA-licensed engineer |
| Measurements | Thermography and power quality |
| Report | Action plan with timelinemade to order: Findings with risk rating |
| Statutory records | Permit-to-work audit |
| Sampling | Representative LV panels |
| Follow-up | Close-out verification |
| Turnaround | 3-4 weeksmade to order: 1-2 weeks |
| Presentation | Report onlymade to order: Findings to management |
| Accreditation | ISO/IEC 17020 body |