Wind turbine O&M with scheduled maintenance, Edge seriesSample
by Kaverispark Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaverispark Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Edge service of wind turbine O&M with scheduled maintenance by Kaverispark covers 5 fleet size options (5 turbines to 80 turbines). Design: energy loss and curtailment analysis, oil analysis and trend reports and crane mobilisation planning. Suited to repowering and life extension, captive wind generators and wind farm owners post warranty. Delivered in line with IEC 61400-1, IEC 61400-25 and CEA (Measures relating to Safety) Regulations. Mobilisation Takeover in 4-6 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaverispark
- Model
- KAV-E55 series
- Listing type
- Service
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- Takeover in 4-6 weeks
- Warranty
- Work warranty 6 months
- Standards
- IEC 61400-1, IEC 61400-25, CEA (Measures relating to Safety) Regulations
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Fleet size5 turbinesKAV-E55-01 | Fleet size: 5 turbines | 1 nos · Takeover in 4-6 weeks | on quote |
| Fleet size10 turbinesKAV-E55-02 | Fleet size: 10 turbines | 1 nos · Takeover in 4-6 weeks | on quote |
| Fleet size20 turbinesKAV-E55-03 | Fleet size: 20 turbines | 1 nos · Takeover in 4-6 weeks | on quote |
| Fleet size40 turbinesKAV-E55-04 | Fleet size: 40 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
| Fleet size80 turbinesKAV-E55-05 | Fleet size: 80 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
Specifications
| Fleet size | 5 turbines to 80 turbines (see variants) |
|---|---|
| Scope | Availability based O&Mmade to order: Scheduled maintenance only / Comprehensive including spares |
| Turbine class | Up to 1.5 MW |
| Availability guarantee | 95% machine availability |
| Technician team | Local crew plus rope-access teammade to order: Site manager plus 2 technicians per 5 turbines |
| Blade inspection | Annual drone and rope inspection |
| Gearbox oil | Quarterly sampling and filtration |
| Major components | Included with capmade to order: Excluded |
| Monitoring | Vibration based CMS |
| Response | 24 hoursmade to order: 12 hours for faults |
| Term | 1 yearmade to order: 3 years / 5 years |