Catalogue / Static transfer switches
Static transfer switch (STS), Eco 5 seriesSample
by Kiranmax Critical Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kiranmax Critical Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Eco 5 range of static transfer switch (STS) by Kiranmax covers 4 rating options (63 A to 400 A). Highlights: preferred source selection with auto retransfer, maintenance bypass for hot service and hot-swap design on rack models. Suited to telecom exchanges, hospital critical loads and dual UPS bus architecture. Designed and tested to IEC 62310-3, IEC 62310-1 and IEC 62310-2. Lead time 6-8 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kiranmax
- Model
- KIR-DF9 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 6-8 weeks
- Warranty
- 24 months from supply
- Standards
- IEC 62310-3, IEC 62310-1, IEC 62310-2
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- As per item, transit-safe
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Rating63 AKIR-DF9-01 | Rating: 63 A | 2 nos · 6-8 weeks | for verified buyers |
| Rating125 AKIR-DF9-02 | Rating: 125 A | 2 nos · 6-8 weeks | for verified buyers |
| Rating250 AKIR-DF9-03 | Rating: 250 A | 2 nos · 6-8 weeks | for verified buyers |
| Rating400 AKIR-DF9-04 | Rating: 400 A | 2 nos · 6-8 weeks | for verified buyers |
Specifications
| Rating | 63 A to 400 A (see variants) |
|---|---|
| Phase | 1-phase |
| Rated voltage | 415 V AC |
| Transfer time | Below 4 ms |
| Transfer type | Make-before-breakmade to order: Break-before-make |
| Switching device | SCR thyristors |
| Source priority | Preferred source selectable |
| Maintenance bypass | Manual make-before-break |
| Overload | 125% 10 min |
| Efficiency | Above 99% |
| Display | Touchscreenmade to order: LCD |
| Communication | Modbus RTUmade to order: SNMP / Dry contacts |
| Mounting | Floor standingmade to order: 1U/2U rack |