Catalogue / Rack PDUs & busway
Floor PDU with branch monitoring, Plus 4 seriesSample
by Kiranmax Critical Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kiranmax Critical Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Floor PDU with branch monitoring from Kiranmax, Plus 4 series: 4 current options between 63 A and 400 A. Key features: tool-less 0U vertical mounting, busway allows adding tap-offs on live system and locking IEC C13/C19 outlets prevent accidental unplugging. Suited to server rooms, data centre racks and colocation halls. Designed and tested to IEC 62368-1, IEC 60320 and IEC 61439-6. Lead time 4-6 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kiranmax
- Model
- KIR-E61 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 4-6 weeks
- Warranty
- 12 months from supply
- Standards
- IEC 62368-1, IEC 60320, IEC 61439-6
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Current63 AKIR-E61-01 | Current: 63 A | 1 nos · 4-6 weeks | for verified buyers |
| Current125 AKIR-E61-02 | Current: 125 A | 1 nos · 4-6 weeks | for verified buyers |
| Current250 AKIR-E61-03 | Current: 250 A | 1 nos · 4-6 weeks | for verified buyers |
| Current400 AKIR-E61-04 | Current: 400 A | 1 nos · 4-6 weeks | for verified buyers |
Specifications
| Current | 63 A to 400 A (see variants) |
|---|---|
| Type | Monitored by outlet |
| Phase | 1-phasemade to order: 3-phase |
| Outlets | 20 x C13 + 4 x C19made to order: 12 x C13 / 24 x C13 / 42 x C13 |
| Voltage | 230 V |
| Mounting | Overhead |
| Input plug | IEC 60309 |
| Metering accuracy | 0.5%made to order: 1% |
| Network | SNMPmade to order: Ethernet / Modbus |
| Busway rating | Up to 800 A |
| Sensors | Temperature |
| Breakers | Per-phase MCBmade to order: Per-outlet MCB |
| Cord length | 2 mmade to order: 3 m |