Catalogue / Demand response

No photo yet

Time-of-day tariff optimisation, Smart seriesSample

by Kiransys Associates (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kiransys Associates (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Kiransys Smart time-of-day tariff optimisation, offered in 4 curtailable load options from 0.5 MW to 10 MW. Highlights: revenue for flexible loads, real-time dashboards and reduced peak demand charges. Used by DISCOMs needing peak relief, cold storage and water pumping and commercial buildings. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kiransys
Model
KIR-1A7 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Enrolment 4-8 weeks
Warranty
Performance reporting
Standards
CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Curtailable load0.5 MWKIR-1A7-01Curtailable load: 0.5 MW1 MW · Enrolment 4-8 weeksfor verified buyers
Curtailable load1 MWKIR-1A7-02Curtailable load: 1 MW1 MW · Enrolment 4-8 weeksfor verified buyers
Curtailable load5 MWKIR-1A7-03Curtailable load: 5 MW1 MW · Enrolment 4-8 weeksfor verified buyers
Curtailable load10 MWKIR-1A7-04Curtailable load: 10 MW1 MW · Enrolment 4-8 weeksfor verified buyers

Specifications

Curtailable load0.5 MW to 10 MW (see variants)
ProgrammeUtility DR
ControlManual
Notice2 hours
Duration per event1 hourmade to order: 4 hours
Events per yearUnlimitedmade to order: 20 / 50
MeteringExisting metermade to order: Dedicated interval meter
Incentive sharing80:20
Baseline methodRegressionmade to order: 10-day average
ReportingEvent report
Contract term1 yearmade to order: 3 years

BARREL: Bharat Atom Renewable Resources Energy Limited