Time-of-day tariff optimisation, Xtra seriesSample
by Kiransys Associates (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kiransys Associates (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Xtra service of time-of-day tariff optimisation by Kiransys covers 4 curtailable load options (5 MW to 50 MW). Key features: real-time dashboards, integration with plant process limits and settlement transparency. Used by cold storage and water pumping, DISCOMs needing peak relief and commercial buildings. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kiransys
- Model
- KIR-1A4 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load5 MWKIR-1A4-01 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load10 MWKIR-1A4-02 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load25 MWKIR-1A4-03 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load50 MWKIR-1A4-04 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 5 MW to 50 MW (see variants) |
|---|---|
| Programme | TOD optimisationmade to order: Utility DR / Aggregator DR |
| Control | Manualmade to order: Automated through SCADA |
| Notice | Day aheadmade to order: 2 hours / 15 minutes |
| Duration per event | 1 hour |
| Events per year | 20 |
| Metering | Dedicated interval meter |
| Incentive sharing | 80:20 |
| Baseline method | 10-day averagemade to order: Regression |
| Reporting | Monthly savings |
| Contract term | 3 years |