Catalogue / Hydro turbines (Francis, Kaplan, Pelton)
Bulb turbine, Prime 2 seriesSample
by Konark Hydro Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Konark Hydro Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Bulb turbine from Konark, Prime 2 series: 6 turbine output options between 3 MW and 100 MW. Highlights: wear-resistant coating for Himalayan silt, stainless steel runner for sediment-laden rivers and efficiency guarantee supported by tests. Used by reservoir-based plants, run-of-river schemes and renovation and modernisation. Designed and tested to IEC 60193, IEC 60041 and IS 12800. Lead time 10-14 months; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Konark
- Model
- KON-AA2 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 months
- Warranty
- 36 months
- Standards
- IEC 60193, IEC 60041, IS 12800
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Turbine output3 MWKON-AA2-01 | Turbine output: 3 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output5 MWKON-AA2-02 | Turbine output: 5 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output10 MWKON-AA2-03 | Turbine output: 10 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output25 MWKON-AA2-04 | Turbine output: 25 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output50 MWKON-AA2-05 | Turbine output: 50 MW | 1 nos · 14-20 months | for verified buyers |
| Turbine output100 MWKON-AA2-06 | Turbine output: 100 MW | 1 nos · 14-20 months | for verified buyers |
Specifications
| Turbine output | 3 MW to 100 MW (see variants) |
|---|---|
| Turbine type | Francismade to order: Kaplan / Pelton / Bulb |
| Net head | 200-800 mmade to order: 5-30 m / 30-200 m |
| Rated speed | 428 rpmmade to order: 375 rpm / 500 rpm / 750 rpm |
| Shaft orientation | Verticalmade to order: Horizontal |
| Runner material | 13Cr-4Ni stainless steel |
| Efficiency at best point | 93%made to order: 91% / 94% |
| Flow range | 3-100 m3/s |
| Wicket gates | Cast steel with oil-free bushes |
| Runaway speed | 1.8 x ratedmade to order: 2.2 x rated |
| Design life | 40 years |