Catalogue / Hydro turbines (Francis, Kaplan, Pelton)
Bulb turbine, Ultra seriesSample
by Konark Hydro Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Konark Hydro Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Ultra range of bulb turbine by Konark covers 6 turbine output options (3 MW to 100 MW). Highlights: shop assembly and trial prior to dispatch, efficiency guarantee supported by tests and model-tested hydraulic design. Typically used for reservoir-based plants, renovation and modernisation and small hydro projects. Designed and tested to IEC 60193, IEC 60041 and IS 12800. Lead time 10-14 months; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Konark
- Model
- KON-AA2 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 months
- Warranty
- 36 months
- Standards
- IEC 60193, IEC 60041, IS 12800
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- FOR site, freight included
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Turbine output3 MWKON-AA2-01 | Turbine output: 3 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output5 MWKON-AA2-02 | Turbine output: 5 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output10 MWKON-AA2-03 | Turbine output: 10 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output25 MWKON-AA2-04 | Turbine output: 25 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output50 MWKON-AA2-05 | Turbine output: 50 MW | 1 nos · 14-20 months | for verified buyers |
| Turbine output100 MWKON-AA2-06 | Turbine output: 100 MW | 1 nos · 14-20 months | for verified buyers |
Specifications
| Turbine output | 3 MW to 100 MW (see variants) |
|---|---|
| Turbine type | Pelton |
| Net head | 200-800 mmade to order: 5-30 m / 30-200 m |
| Rated speed | 750 rpmmade to order: 375 rpm / 428 rpm / 500 rpm |
| Shaft orientation | Verticalmade to order: Horizontal |
| Runner material | Cast carbon steel |
| Efficiency at best point | 91%made to order: 93% / 94% |
| Flow range | 3-100 m3/s |
| Wicket gates | Cast steel with oil-free bushes |
| Runaway speed | 2.2 x rated |
| Design life | 40 years |