Catalogue / Traction SCADA

No photo yet

Remote control centre for traction, Eco seriesSample

by Konarkkiran Rail Electrification (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Konarkkiran Rail Electrification (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Eco range of remote control centre for traction by Konarkkiran covers 4 control posts options (Up to 10 posts to Up to 100 posts). Key features: sequence of events recording, remote operation of interrupters and isolators and integration with OHE maintenance. Typically used for metro traction control, railway zones and freight corridors. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Konarkkiran
Model
KON-EA2 series
Listing type
Product
Unit
lot
Minimum order
2 lot
Lead time
12-16 weeks
Warranty
36 months with AMC
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
FOR site, freight included
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsKON-EA2-01Control posts: Up to 10 posts2 lot · 12-16 weeksfor verified buyers
Control postsUp to 25 postsKON-EA2-02Control posts: Up to 25 posts2 lot · 12-16 weeksfor verified buyers
Control postsUp to 50 postsKON-EA2-03Control posts: Up to 50 posts2 lot · 20-28 weeksfor verified buyers
Control postsUp to 100 postsKON-EA2-04Control posts: Up to 100 posts2 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 100 posts (see variants)
ArchitectureDistributedmade to order: Redundant server
RTU I/OPer post
CommunicationOFC / MPLS
ProtocolIEC 61850made to order: IEC 60870-5-104
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited