Catalogue / OHE masts, cantilevers & catenary
Portal for overhead equipment, Ultra 7 seriesSample
by Konarkkiran Rail Electrification (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Konarkkiran Rail Electrification (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Ultra 7 range of portal for overhead equipment by Konarkkiran covers 5 mast type options (Double track mast to Booster mast). Design: suitable for 25 kV AC traction, galvanised after fabrication and designed per RDSO drawings. Suited to port railways, metro depots and railway electrification. Designed and tested to RDSO TI/SPC/OHE, IS 800 and IS 2062. Lead time 4-6 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Konarkkiran
- Model
- KON-F52 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 4-6 weeks
- Warranty
- As per contract
- Standards
- RDSO TI/SPC/OHE, IS 800, IS 2062
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR site, freight included
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Mast typeDouble track mastKON-F52-01 | Mast type: Double track mast | 1 nos · 4-6 weeks | on quote |
| Mast typePortal 2-trackKON-F52-02 | Mast type: Portal 2-track | 1 nos · 4-6 weeks | on quote |
| Mast typePortal 4-trackKON-F52-03 | Mast type: Portal 4-track | 1 nos · 4-6 weeks | on quote |
| Mast typeTunnel bracketKON-F52-04 | Mast type: Tunnel bracket | 1 nos · 8-12 weeks | on quote |
| Mast typeBooster mastKON-F52-05 | Mast type: Booster mast | 1 nos · 8-12 weeks | on quote |
Specifications
| Mast type | Double track mast to Booster mast (see variants) |
|---|---|
| Section | Tubular |
| Height | 9.5 m |
| Steel grade | Fe 490 |
| Galvanising | Hot-dip 610 g/m2 |
| Mast bending moment | Per RDSO |
| Foundation | Concrete block |
| Cantilever | Tubular, galvanised |
| Registration arm | Included |
| Insulator | Polymer or porcelain |
| Setting distance | 3.5 mmade to order: 2.8 m |
| Fittings | Hot-dip galvanised |
| Welding | Certified welders |