SCADA for 25 kV AC electrification, Xtra seriesSample
by Konarkkiran Rail Electrification (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Konarkkiran Rail Electrification (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Konarkkiran Xtra SCADA for 25 kV AC electrification, offered in 3 control posts options from Up to 25 posts to Up to 100 posts. Highlights: failover in under 3 seconds, remote operation of interrupters and isolators and sequence of events recording. Suited to metro traction control, industrial rail and freight corridors. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Konarkkiran
- Model
- KON-C52 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 20-28 weeks
- Warranty
- 24 months
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 25 postsKON-C52-01 | Control posts: Up to 25 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 50 postsKON-C52-02 | Control posts: Up to 50 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 100 postsKON-C52-03 | Control posts: Up to 100 posts | 1 lot · 20-28 weeks | for verified buyers |
Specifications
| Control posts | Up to 25 posts to Up to 100 posts (see variants) |
|---|---|
| Architecture | Distributedmade to order: Redundant server |
| RTU I/O | Per post |
| Communication | GSM backup |
| Protocol | IEC 60870-5-104made to order: IEC 61850 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |