Catalogue / Traction SCADA

No photo yet

Traction SCADA system, Max 9 seriesSample

by Konarkkiran Rail Electrification (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Konarkkiran Rail Electrification (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Traction SCADA system from Konarkkiran, Max 9 series: 4 control posts options between Up to 10 posts and Up to 100 posts. Highlights: remote operation of interrupters and isolators, sequence of events recording and impedance fault locator. Suited to freight corridors, metro traction control and mining railways. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Konarkkiran
Model
KON-6A3 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
12-16 weeks
Warranty
24 months
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
Ex-works, freight extra at actuals
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsKON-6A3-01Control posts: Up to 10 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 25 postsKON-6A3-02Control posts: Up to 25 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 50 postsKON-6A3-03Control posts: Up to 50 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 100 postsKON-6A3-04Control posts: Up to 100 posts1 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 100 posts (see variants)
ArchitectureRedundant server
RTU I/OPer post
CommunicationOFC / MPLSmade to order: GSM backup
ProtocolIEC 60870-5-104
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited