Traction SCADA system, Max 9 seriesSample
by Konarkkiran Rail Electrification (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Konarkkiran Rail Electrification (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Traction SCADA system from Konarkkiran, Max 9 series: 4 control posts options between Up to 10 posts and Up to 100 posts. Highlights: remote operation of interrupters and isolators, sequence of events recording and impedance fault locator. Suited to freight corridors, metro traction control and mining railways. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Konarkkiran
- Model
- KON-6A3 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 12-16 weeks
- Warranty
- 24 months
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- As per item, transit-safe
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 10 postsKON-6A3-01 | Control posts: Up to 10 posts | 1 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 25 postsKON-6A3-02 | Control posts: Up to 25 posts | 1 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 50 postsKON-6A3-03 | Control posts: Up to 50 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 100 postsKON-6A3-04 | Control posts: Up to 100 posts | 1 lot · 20-28 weeks | for verified buyers |
Specifications
| Control posts | Up to 10 posts to Up to 100 posts (see variants) |
|---|---|
| Architecture | Redundant server |
| RTU I/O | Per post |
| Communication | OFC / MPLSmade to order: GSM backup |
| Protocol | IEC 60870-5-104 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |