Catalogue / Panel wiring & assembly
Relay and meter panel assembly, Ultra seriesSample
by Konarksamarth Industrial Supplies (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Konarksamarth Industrial Supplies (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Relay and meter panel assembly from Konarksamarth, Ultra series: 6 panel complexity options between Up to 50 wires and Over 2000 wires. Highlights: dressed cabling with duct, as-built documentation and ferrule numbering and colour code. Suited to switchgear manufacturers, industrial automation and solar and wind projects. Delivered in line with IEC 61439-1, IS 8623 and IS 13947. Mobilisation 1-2 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Konarksamarth
- Model
- KON-A25 series
- Listing type
- Service
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 1-2 weeks
- Warranty
- Rework of wiring defects
- Standards
- IEC 61439-1, IS 8623, IS 13947
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Panel complexityUp to 50 wiresKON-A25-01 | Panel complexity: Up to 50 wires | 1 nos · 1-2 weeks | on quote |
| Panel complexityUp to 200 wiresKON-A25-02 | Panel complexity: Up to 200 wires | 1 nos · 1-2 weeks | on quote |
| Panel complexityUp to 500 wiresKON-A25-03 | Panel complexity: Up to 500 wires | 1 nos · 1-2 weeks | on quote |
| Panel complexityUp to 1000 wiresKON-A25-04 | Panel complexity: Up to 1000 wires | 1 nos · 1-2 weeks | on quote |
| Panel complexityUp to 2000 wiresKON-A25-05 | Panel complexity: Up to 2000 wires | 1 nos · 3-5 weeks | on quote |
| Panel complexityOver 2000 wiresKON-A25-06 | Panel complexity: Over 2000 wires | 1 nos · 3-5 weeks | on quote |
Specifications
| Panel complexity | Up to 50 wires to Over 2000 wires (see variants) |
|---|---|
| Panel type | LT distribution |
| Wiring standard | IEC 61439made to order: IS 8623 |
| Wire type | FRLS 1.5 sq mmmade to order: FRLS 2.5 sq mm / Multi-core |
| Ferrules | Printed with numbering |
| Testing | Functional test |
| Components | Customer supplied |
| Documents | Test reportmade to order: As-built drawing |
| Enclosure | Customermade to order: Assembler |
| Marking | Engraved labels |
| Inspection | Third party optional |