Catalogue / Mobile substations

No photo yet

Containerised mobile substation, Elite 4 seriesSample

by Konark Transformer Works (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Konark Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Containerised mobile substation from Konark, Elite 4 series: 4 transformer rating options between 10 MVA and 50 MVA. Highlights: bay-extension and maintenance outage cover, compact oil spill containment and suitable for road transport within weight limits. Used by event power supply, maintenance outage support and mining sites. Designed and tested to IEC 62271-202, IS 2026 and IEC 60076. Lead time 30-40 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Konark
Model
KON-8E1 series
Listing type
Product
Unit
nos
Minimum order
2 nos
Lead time
30-40 weeks
Warranty
24 months
Standards
IEC 62271-202, IS 2026, IEC 60076
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
FOR site, freight included
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Transformer rating10 MVAKON-8E1-01Transformer rating: 10 MVA2 nos · 30-40 weeksfor verified buyers
Transformer rating20 MVAKON-8E1-02Transformer rating: 20 MVA2 nos · 30-40 weeksfor verified buyers
Transformer rating31.5 MVAKON-8E1-03Transformer rating: 31.5 MVA2 nos · 30-40 weeksfor verified buyers
Transformer rating50 MVAKON-8E1-04Transformer rating: 50 MVA2 nos · 30-40 weeksfor verified buyers

Specifications

Transformer rating10 MVA to 50 MVA (see variants)
Primary voltage132 kV
Secondary voltage11 kVmade to order: 33 kV
ChassisContainer
Primary switchgearAIS disconnector and breaker
Secondary switchgearIndoor VCB panel
Control and relayNumerical relays
Fire protectionDetection and extinguisher
Auxiliary supplyDC battery + DG
Transport weightUp to 45 t
Setup time< 4 hours
GroundingMobile earthing kit
Cable reelIncluded