Catalogue / Static transfer switches
Dual input source selector, Plus seriesSample
by Konark UPS Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Konark UPS Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Plus range of dual input source selector by Konark covers 4 rating options (63 A to 400 A). Design: maintenance bypass for hot service, preferred source selection with auto retransfer and phase-angle synchronism check before transfer. Used by dual UPS bus architecture, telecom exchanges and single-corded server loads in data centres. Designed and tested to IEC 62310-3, IEC 62310-1 and IEC 62310-2. Lead time 3-4 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Konark
- Model
- KON-693 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 3-4 weeks
- Warranty
- 12 months from commissioning
- Standards
- IEC 62310-3, IEC 62310-1, IEC 62310-2
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR nearest railhead
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Rating63 AKON-693-01 | Rating: 63 A | 10 nos · 3-4 weeks | for verified buyers |
| Rating125 AKON-693-02 | Rating: 125 A | 10 nos · 3-4 weeks | for verified buyers |
| Rating250 AKON-693-03 | Rating: 250 A | 10 nos · 6-8 weeks | for verified buyers |
| Rating400 AKON-693-04 | Rating: 400 A | 10 nos · 6-8 weeks | for verified buyers |
Specifications
| Rating | 63 A to 400 A (see variants) |
|---|---|
| Phase | 1-phase |
| Rated voltage | 230 V AC |
| Transfer time | Below 4 ms |
| Transfer type | Break-before-make |
| Switching device | SCR thyristors |
| Source priority | Preferred source selectable |
| Maintenance bypass | Nonemade to order: Manual make-before-break |
| Overload | 150% 1 minmade to order: 125% 10 min |
| Efficiency | Above 99% |
| Display | Touchscreenmade to order: LCD |
| Communication | Modbus RTU |
| Mounting | Floor standing |