Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Cable and insulation resistance testing, Eco seriesSample

by Krishna Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Krishna Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Krishna Eco cable and insulation resistance testing, offered in 3 plant size options from 5 MW to 25 MW. Highlights: final dossier for handover, support to CEIG inspection and instrument calibration certificates. Used by industrial substations, lender completion and renewable parks. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation On-site 3-21 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Krishna
Model
KRI-C61 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
On-site 3-21 days
Warranty
Report accuracy guaranteed
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size5 MWKRI-C61-01Plant size: 5 MW1 site · On-site 3-21 dayson quote
Plant size10 MWKRI-C61-02Plant size: 10 MW1 site · On-site 3-21 dayson quote
Plant size25 MWKRI-C61-03Plant size: 25 MW1 site · On-site 3-21 dayson quote

Specifications

Plant size5 MW to 25 MW (see variants)
ScopeElectrical pre-commissioningmade to order: Solar SAT / Complete SAT with performance test
InstrumentsInsulation tester, earth tester
Test sequencePer client approved formatmade to order: Visual, mechanical, electrical
TeamTest engineer plus 2 technicians
Duration on site10 daysmade to order: 3-5 days / 3 weeks
ReportsTest results on approved formatsmade to order: Digital dossier with photos
CalibrationNABL traceablemade to order: Calibration certificates attached
Witnessed byLender engineer or authoritymade to order: Client engineer
Retest policyOne retest includedmade to order: Charged
PaymentOn completion of reportmade to order: 50% advance

BARREL: Bharat Atom Renewable Resources Energy Limited