Substation insulator hot washing, Xtra 7 seriesSample

by Krishna Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Krishna Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Substation insulator hot washing from Krishna, Xtra 7 series: 5 voltage level options between 33 kV and 400 kV. Key features: pre-wash contamination assessment, no outage required for washing and reduced flashover risk in polluted areas. Suited to utility transmission networks, substations in dusty regions and coastal and industrial pollution zones. Delivered in line with IEC 60815, CEA (Measures relating to Safety) Regulations and IEEE 957. Mobilisation Permit based scheduling; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Krishna
Model
KRI-AF7 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Permit based scheduling
Warranty
As per contract
Standards
IEC 60815, CEA (Measures relating to Safety) Regulations, IEEE 957
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Voltage level33 kVKRI-AF7-01Voltage level: 33 kV1 job · Permit based schedulingon quote
Voltage level66 kVKRI-AF7-02Voltage level: 66 kV1 job · Permit based schedulingon quote
Voltage level132 kVKRI-AF7-03Voltage level: 132 kV1 job · Permit based schedulingon quote
Voltage level220 kVKRI-AF7-04Voltage level: 220 kV1 job · Permit based schedulingon quote
Voltage level400 kVKRI-AF7-05Voltage level: 400 kV1 job · Permit based schedulingon quote

Specifications

Voltage level33 kV to 400 kV (see variants)
MethodPressurised water jet
Resistivity of waterAbove 5000 ohm-cmmade to order: Demineralised water
ScopePer bay
FrequencyPre- and post-monsoonmade to order: Pre-monsoon / Quarterly in coastal areas
CrewLinemen with insulated platformmade to order: Team of 5 with live-line operator
ToolsBucket with insulated boommade to order: Insulated hot sticks, bucket truck
SafetyShutdown not requiredmade to order: Approved method statement
OutputsPhoto log of insulatorsmade to order: Pre and post leakage current
Productivity30 towers per day
LicenceTrained under utility protocols