Catalogue / Thermography & condition monitoring

No photo yet

Infrared thermography survey, Edge seriesSample

by Krishna Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Krishna Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Infrared thermography survey from Krishna, Edge series: 4 asset size options between 1 MW and 25 MW. Highlights: hotspot location tagged with GPS, trend data for repeated surveys and safe scanning without shutdown. Used by solar plants (module and string hotspots), wind turbine electrical systems and industrial MCC panels. Delivered in line with ISO 18434-1, IEC 62446-3 and IEEE 1584. Mobilisation Mobilisation in 3-7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Krishna
Model
KRI-534 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Mobilisation in 3-7 days
Warranty
Report accuracy as per method
Standards
ISO 18434-1, IEC 62446-3, IEEE 1584
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Asset size1 MWKRI-534-01Asset size: 1 MW1 site · Mobilisation in 3-7 dayson quote
Asset size5 MWKRI-534-02Asset size: 5 MW1 site · Mobilisation in 3-7 dayson quote
Asset size10 MWKRI-534-03Asset size: 10 MW1 site · Report in 5-10 dayson quote
Asset size25 MWKRI-534-04Asset size: 25 MW1 site · Report in 5-10 dayson quote

Specifications

Asset size1 MW to 25 MW (see variants)
TechniqueVibration analysis
Camera resolution1280x1024 radiometric
DeliverableCAT-wise severity ranking with fix actionsmade to order: Annotated hotspot report
Drone servicesOrthomosaic of full plantmade to order: Ground sampling 3 cm per pixel
Defect classificationDelta T based severitymade to order: Per client maintenance policy
TeamLevel II thermographer plus pilotmade to order: Level II thermographer
CertificationTechnicians with ASNT level IImade to order: ISO 18436-7 trained
TurnaroundReport in 5 daysmade to order: Report in 10 days
FrequencyAnnual or bi-annual planmade to order: One-time
SoftwareCloud dashboard with trend historymade to order: Analyser software with thermal library

BARREL: Bharat Atom Renewable Resources Energy Limited