Catalogue / Third-party inspection (TPI)
Solar module and inverter inspection, Pro seriesSample
by Krishna Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Krishna Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Pro service of solar module and inverter inspection by Krishna covers 3 inspection effort options (1 man-day to 10 man-days). Key features: calibration check of test equipment, hold and witness points per QAP and quick mobilisation across India. Used by lender quality assurance, government procurement and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Krishna
- Model
- KRI-AE6 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayKRI-AE6-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort5 man-daysKRI-AE6-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort10 man-daysKRI-AE6-03 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
Specifications
| Inspection effort | 1 man-day to 10 man-days (see variants) |
|---|---|
| Equipment inspected | Cables and conductorsmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters |
| Inspection stage | Final pre-dispatch |
| Standards used | Per client specification |
| Inspector qualification | B.E. Electrical with 8 years experience |
| Accreditation | ISO/IEC 17020 body |
| Report | Inspection release notemade to order: Detailed report with photos in 48 hours |
| Coverage | Pan Indiamade to order: Domestic and export vendors |
| Sampling | AQL level IImade to order: As per IS 2500 |
| Release note | Digital signaturemade to order: Hard copy plus scan |
| Travel | At actualsmade to order: Included in rate |