Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Cable and insulation resistance testing, Edge seriesSample

by Krishna Infra Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Krishna Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Krishna Edge cable and insulation resistance testing, offered in 5 plant size options from 10 MW to 250 MW. Key features: final dossier for handover, defect register shared daily and checklist driven testing. Used by renewable parks, EPC handover and lender completion. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation On-site 3-21 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Krishna
Model
KRI-C69 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
On-site 3-21 days
Warranty
Retest at no cost on instrument error
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size10 MWKRI-C69-01Plant size: 10 MW1 site · On-site 3-21 daysfor verified buyers
Plant size25 MWKRI-C69-02Plant size: 25 MW1 site · On-site 3-21 daysfor verified buyers
Plant size50 MWKRI-C69-03Plant size: 50 MW1 site · On-site 3-21 daysfor verified buyers
Plant size100 MWKRI-C69-04Plant size: 100 MW1 site · On-site 3-21 daysfor verified buyers
Plant size250 MWKRI-C69-05Plant size: 250 MW1 site · On-site 3-21 daysfor verified buyers

Specifications

Plant size10 MW to 250 MW (see variants)
ScopeSolar SAT
InstrumentsRelay test set, IV tracer, CRMmade to order: Insulation tester, earth tester
Test sequenceVisual, mechanical, electrical
TeamTeam of 6 with leadmade to order: Test engineer plus 2 technicians
Duration on site3-5 days
ReportsDigital dossier with photos
CalibrationNABL traceablemade to order: Calibration certificates attached
Witnessed byClient engineermade to order: Lender engineer or authority
Retest policyOne retest includedmade to order: Charged
PaymentOn completion of report

BARREL: Bharat Atom Renewable Resources Energy Limited