Catalogue / Electrical safety audits

No photo yet

Electrical safety audit of industrial plants, Elite seriesSample

by Krishna Infra Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Krishna Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Elite service of electrical safety audit of industrial plants by Krishna covers 3 installed load options (500 kVA to 5 MVA). Key features: earthing health and soil resistivity, risk-ranked findings and training recommendations for staff. Used by data centres, hospitals and commercial buildings and manufacturing plants. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Krishna
Model
KRI-681 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Re-audit at reduced rate
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load500 kVAKRI-681-01Installed load: 500 kVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load1 MVAKRI-681-02Installed load: 1 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load5 MVAKRI-681-03Installed load: 5 MVA1 site · Audit in 1-2 weeksfor verified buyers

Specifications

Installed load500 kVA to 5 MVA (see variants)
ScopeVisual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study
AuditorChartered engineer
MeasurementsEarth resistance, insulationmade to order: Thermography and power quality
ReportFindings with risk ratingmade to order: Action plan with timeline
Statutory recordsRegisters, test certificates, licence
Sampling100% of HV equipmentmade to order: Representative LV panels
Follow-upRe-audit after 3 months
Turnaround3-4 weeksmade to order: 1-2 weeks
PresentationFindings to managementmade to order: Report only
AccreditationGovernment recognised agencymade to order: ISO/IEC 17020 body

BARREL: Bharat Atom Renewable Resources Energy Limited