Catalogue / Electrical safety audits
Electrical safety audit of industrial plants, Elite seriesSample
by Krishna Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Krishna Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Elite service of electrical safety audit of industrial plants by Krishna covers 3 installed load options (500 kVA to 5 MVA). Key features: earthing health and soil resistivity, risk-ranked findings and training recommendations for staff. Used by data centres, hospitals and commercial buildings and manufacturing plants. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Krishna
- Model
- KRI-681 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Re-audit at reduced rate
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load500 kVAKRI-681-01 | Installed load: 500 kVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load1 MVAKRI-681-02 | Installed load: 1 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load5 MVAKRI-681-03 | Installed load: 5 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
Specifications
| Installed load | 500 kVA to 5 MVA (see variants) |
|---|---|
| Scope | Visual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study |
| Auditor | Chartered engineer |
| Measurements | Earth resistance, insulationmade to order: Thermography and power quality |
| Report | Findings with risk ratingmade to order: Action plan with timeline |
| Statutory records | Registers, test certificates, licence |
| Sampling | 100% of HV equipmentmade to order: Representative LV panels |
| Follow-up | Re-audit after 3 months |
| Turnaround | 3-4 weeksmade to order: 1-2 weeks |
| Presentation | Findings to managementmade to order: Report only |
| Accreditation | Government recognised agencymade to order: ISO/IEC 17020 body |