Catalogue / Substation & line O&M
Transmission line patrolling and maintenance, Smart seriesSample
by Krishna Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Krishna Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Transmission line patrolling and maintenance from Krishna, Smart series: 4 voltage level options between 66 kV and 400 kV. Design: outage planning with the utility, fault analysis within 24 hours and permit-to-work and lockout-tagout. Typically used for state utility outsourcing, renewable pooling substations and railway and metro sub-stations. Delivered in line with CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations and IS 10028 (Transformer Installation). Mobilisation Mobilisation in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Krishna
- Model
- KRI-725 series
- Listing type
- Service
- Unit
- month
- Minimum order
- 1 month
- Lead time
- Mobilisation in 2-3 weeks
- Warranty
- As per contract
- Standards
- CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations, IS 10028 (Transformer Installation)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level66 kVKRI-725-01 | Voltage level: 66 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level132 kVKRI-725-02 | Voltage level: 132 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level220 kVKRI-725-03 | Voltage level: 220 kV | 1 month · Baseline condition audit first | on quote |
| Voltage level400 kVKRI-725-04 | Voltage level: 400 kV | 1 month · Baseline condition audit first | on quote |
Specifications
| Voltage level | 66 kV to 400 kV (see variants) |
|---|---|
| Scope | Maintenance onlymade to order: Operation and maintenance / Operation, maintenance and statutory compliance |
| Shift pattern | General shift plus on-call |
| Manpower | Two engineers plus 12 staff |
| Line patrolling | Monthly foot patrol |
| Testing | Thermography twice a yearmade to order: Annual relay and CT/PT test |
| Statutory records | Log books, permits, shutdown registermade to order: CEIG renewal support |
| Spares | Consumables included |
| Response time | 4 hoursmade to order: 2 hours for trip |
| Reporting | Real-time dashboards |
| Term | 1 year |