Catalogue / Furnace & rectifier transformers

No photo yet

Electric arc furnace transformer, Flex seriesSample

by Kutchwatt Transformer Works (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kutchwatt Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Flex range of electric arc furnace transformer by Kutchwatt covers 3 rating options (2 MVA to 10 MVA). Key features: heavy-duty OLTC for many operations per day, high current LV bus design and rigid winding clamping. Typically used for chlor-alkali, ferro-alloy plants and aluminium smelters. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 28-36 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kutchwatt
Model
KUT-2B9 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
28-36 weeks
Warranty
24 months
Standards
IS 2026, IEC 60076, IEC 61378-1
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Packaging
Corrugated box on pallet
Delivery terms
Ex-works, freight extra at actuals
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating2 MVAKUT-2B9-01Rating: 2 MVA1 nos · 28-36 weeksfor verified buyers
Rating5 MVAKUT-2B9-02Rating: 5 MVA1 nos · 28-36 weeksfor verified buyers
Rating10 MVAKUT-2B9-03Rating: 10 MVA1 nos · 28-36 weeksfor verified buyers

Specifications

Rating2 MVA to 10 MVA (see variants)
Primary voltage132 kVmade to order: 11 kV / 33 kV / 66 kV
Secondary voltageUp to 1000 V
ApplicationRectifiermade to order: EAF / LRF / SAF
CoolingOFAFmade to order: ONAN/ONAF / OFWF
Tap changerOLTC
Secondary tapsUp to 21 steps
Vector groupDd0
Overload20% for 2 hours
Impedance8%made to order: 6%
ReactorExternalmade to order: In-built
BushingsHigh-current plate type
MonitoringOnline DGA optional

BARREL: Bharat Atom Renewable Resources Energy Limited