Catalogue / Electrical safety audits
Electrical safety audit of industrial plants, Ultra seriesSample
by Lonavala Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Lonavala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Electrical safety audit of industrial plants from Lonavala, Ultra series: 3 installed load options between 1 MVA and 10 MVA. Key features: earthing health and soil resistivity, compliance matrix against CEA safety rules and fire exit and detection checks. Used by manufacturing plants, data centres and solar and wind sites. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Lonavala
- Model
- LON-687 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVALON-687-01 | Installed load: 1 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load5 MVALON-687-02 | Installed load: 5 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load10 MVALON-687-03 | Installed load: 10 MVA | 1 site · Report in 7-14 days | for verified buyers |
Specifications
| Installed load | 1 MVA to 10 MVA (see variants) |
|---|---|
| Scope | Visual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study |
| Auditor | Chartered engineer |
| Measurements | Earth resistance, insulationmade to order: Thermography and power quality |
| Report | Findings with risk ratingmade to order: Action plan with timeline |
| Statutory records | Registers, test certificates, licencemade to order: Permit-to-work audit |
| Sampling | 100% of HV equipment |
| Follow-up | Close-out verification |
| Turnaround | 1-2 weeks |
| Presentation | Findings to management |
| Accreditation | Government recognised agencymade to order: ISO/IEC 17020 body |