Catalogue / Third-party inspection (TPI)
Civil and structural stage inspection, Xtra 4 seriesSample
by Lonavala Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Lonavala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Xtra 4 service of civil and structural stage inspection by Lonavala covers 5 inspection effort options (1 man-day to 50 man-days). Key features: quick mobilisation across India, photographic evidence of each inspection and calibration check of test equipment. Typically used for government procurement, EPC contractors and developers and lender quality assurance. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Lonavala
- Model
- LON-963 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayLON-963-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort5 man-daysLON-963-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort10 man-daysLON-963-03 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort20 man-daysLON-963-04 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort50 man-daysLON-963-05 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 1 man-day to 50 man-days (see variants) |
|---|---|
| Equipment inspected | Towers and structuresmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters |
| Inspection stage | Final pre-dispatchmade to order: Raw material / In-process |
| Standards used | Per approved QAP |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | Empanelled inspection agencymade to order: ISO/IEC 17020 body |
| Report | Inspection release note |
| Coverage | Pan India |
| Sampling | As per IS 2500 |
| Release note | Digital signaturemade to order: Hard copy plus scan |
| Travel | At actuals |