Catalogue / Third-party inspection (TPI)
Civil and structural stage inspection, Prime 3 seriesSample
by Lonavala Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Lonavala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Lonavala Prime 3 civil and structural stage inspection, offered in 5 inspection effort options from 5 man-days to 100 man-days. Design: non-conformity reports with closure tracking, independent opinion for buyers and photographic evidence of each inspection. Suited to EPC contractors and developers, lender quality assurance and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Lonavala
- Model
- LON-968 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report in 24-48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort5 man-daysLON-968-01 | Inspection effort: 5 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort10 man-daysLON-968-02 | Inspection effort: 10 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort20 man-daysLON-968-03 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort50 man-daysLON-968-04 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort100 man-daysLON-968-05 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 5 man-days to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Towers and structuresmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters |
| Inspection stage | Raw material |
| Standards used | Per approved QAPmade to order: Per client specification |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | ISO/IEC 17020 bodymade to order: Empanelled inspection agency |
| Report | Detailed report with photos in 48 hours |
| Coverage | Pan India |
| Sampling | As per IS 2500made to order: AQL level II |
| Release note | Hard copy plus scan |
| Travel | Included in rate |