Catalogue / Electrical safety audits
Electrical safety audit of industrial plants, Edge seriesSample
by Lonavala Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Lonavala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Electrical safety audit of industrial plants from Lonavala, Edge series: 5 installed load options between 1 MVA and 50 MVA. Design: earthing health and soil resistivity, fire exit and detection checks and risk-ranked findings. Typically used for manufacturing plants, hospitals and commercial buildings and solar and wind sites. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Lonavala
- Model
- LON-681 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Re-audit at reduced rate
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVALON-681-01 | Installed load: 1 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load5 MVALON-681-02 | Installed load: 5 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load10 MVALON-681-03 | Installed load: 10 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load25 MVALON-681-04 | Installed load: 25 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load50 MVALON-681-05 | Installed load: 50 MVA | 1 site · Report in 7-14 days | for verified buyers |
Specifications
| Installed load | 1 MVA to 50 MVA (see variants) |
|---|---|
| Scope | Visual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study |
| Auditor | CEA-licensed engineermade to order: Chartered engineer |
| Measurements | Thermography and power quality |
| Report | Action plan with timelinemade to order: Findings with risk rating |
| Statutory records | Permit-to-work audit |
| Sampling | 100% of HV equipmentmade to order: Representative LV panels |
| Follow-up | Close-out verificationmade to order: Re-audit after 3 months |
| Turnaround | 3-4 weeksmade to order: 1-2 weeks |
| Presentation | Findings to management |
| Accreditation | Government recognised agencymade to order: ISO/IEC 17020 body |