Catalogue / Grid connectivity & GNA applications
Evacuation approval for solar and wind parks, Neo 5 seriesSample
by Lonavalaprabha Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Lonavalaprabha Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Neo 5 service of evacuation approval for solar and wind parks by Lonavalaprabha covers 3 capacity applied options (10 MW to 100 MW). Design: support for relinquishment and transfer, regular updates of queue status and handling of CTU queries. Suited to green hydrogen projects, industrial captive generators and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Lonavalaprabha
- Model
- LON-F34 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWLON-F34-01 | Capacity applied: 10 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied50 MWLON-F34-02 | Capacity applied: 50 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied100 MWLON-F34-03 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
Specifications
| Capacity applied | 10 MW to 100 MW (see variants) |
|---|---|
| Application | Both |
| Scope | Document preparation and filingmade to order: End-to-end liaison |
| Bank guarantee | Arranged through partner bank |
| Studies | Grid impact summarymade to order: Detailed power system study |
| Portal handling | CTUIL portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Filing in 2 weeksmade to order: Approval 3-6 months |
| Technical documents | SLD, land proof, board resolution |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixed |