Catalogue / Grid connectivity & GNA applications
GNA application with CTUIL, Ultra 6 seriesSample
by Lonavalaprabha Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Lonavalaprabha Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
GNA application with CTUIL from Lonavalaprabha, Ultra 6 series: 5 capacity applied options between 50 MW and 1000 MW. Highlights: handling of CTU queries, bank guarantee timeline tracking and regular updates of queue status. Typically used for green hydrogen projects, industrial captive generators and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Lonavalaprabha
- Model
- LON-B82 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied50 MWLON-B82-01 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied100 MWLON-B82-02 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied250 MWLON-B82-03 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied500 MWLON-B82-04 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied1000 MWLON-B82-05 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 50 MW to 1000 MW (see variants) |
|---|---|
| Application | Connectivitymade to order: GNA / Both |
| Scope | End-to-end liaisonmade to order: Document preparation and filing |
| Bank guarantee | Arranged through partner bank |
| Studies | Detailed power system study |
| Portal handling | CTUIL portal |
| Team | Dedicated managermade to order: Regulatory lead and engineer |
| Timeline | Filing in 2 weeks |
| Technical documents | SLD, land proof, board resolutionmade to order: Switchyard layout and GA drawings |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixed |