Catalogue / Hot-gas-path parts & overhaul kits

No photo yet

Combustor liner and transition piece set, Titan 4 seriesSample

by Lonavalavajra Gas Power Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Lonavalavajra Gas Power Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Titan 4 range of combustor liner and transition piece set by Lonavalavajra covers 4 turbine class options (30 MW to 150 MW). Key features: used for hot gas path and major inspections, fully traceable heat and lot records and dimensional inspection to OEM drawings. Typically used for third-party service providers, gas turbine overhauls and industrial gas turbine owners. Designed and tested to ISO 3977, ASTM B637 and AMS 5383. Lead time 8-16 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Lonavalavajra
Model
LON-189 series
Listing type
Product
Unit
set
Minimum order
5 set
Lead time
8-16 weeks
Warranty
12 months
Standards
ISO 3977, ASTM B637, AMS 5383
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
Ex-works, freight extra at actuals
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Turbine class30 MWLON-189-01Turbine class: 30 MW5 set · 8-16 weeksfor verified buyers
Turbine class50 MWLON-189-02Turbine class: 50 MW5 set · 8-16 weeksfor verified buyers
Turbine class100 MWLON-189-03Turbine class: 100 MW5 set · 20-36 weeksfor verified buyers
Turbine class150 MWLON-189-04Turbine class: 150 MW5 set · 20-36 weeksfor verified buyers

Specifications

Turbine class30 MW to 150 MW (see variants)
ComponentNozzles
StageStage 1made to order: Stage 2 / All stages
Base alloyNickel superalloymade to order: Cobalt alloy
CoatingMCrAlY
CoolingImpingement
OriginThird-party certified
RefurbishmentNewmade to order: Repaired and recoated
InspectionFluorescent penetrant, X-ray
Service interval24000 hrsmade to order: 32000 hrs
DocumentationMaterial and heat certificates

BARREL: Bharat Atom Renewable Resources Energy Limited