Catalogue / Hot-gas-path parts & overhaul kits
Combustor liner and transition piece set, Titan 4 seriesSample
by Lonavalavajra Gas Power Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Lonavalavajra Gas Power Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Titan 4 range of combustor liner and transition piece set by Lonavalavajra covers 4 turbine class options (30 MW to 150 MW). Key features: used for hot gas path and major inspections, fully traceable heat and lot records and dimensional inspection to OEM drawings. Typically used for third-party service providers, gas turbine overhauls and industrial gas turbine owners. Designed and tested to ISO 3977, ASTM B637 and AMS 5383. Lead time 8-16 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Lonavalavajra
- Model
- LON-189 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 5 set
- Lead time
- 8-16 weeks
- Warranty
- 12 months
- Standards
- ISO 3977, ASTM B637, AMS 5383
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Turbine class30 MWLON-189-01 | Turbine class: 30 MW | 5 set · 8-16 weeks | for verified buyers |
| Turbine class50 MWLON-189-02 | Turbine class: 50 MW | 5 set · 8-16 weeks | for verified buyers |
| Turbine class100 MWLON-189-03 | Turbine class: 100 MW | 5 set · 20-36 weeks | for verified buyers |
| Turbine class150 MWLON-189-04 | Turbine class: 150 MW | 5 set · 20-36 weeks | for verified buyers |
Specifications
| Turbine class | 30 MW to 150 MW (see variants) |
|---|---|
| Component | Nozzles |
| Stage | Stage 1made to order: Stage 2 / All stages |
| Base alloy | Nickel superalloymade to order: Cobalt alloy |
| Coating | MCrAlY |
| Cooling | Impingement |
| Origin | Third-party certified |
| Refurbishment | Newmade to order: Repaired and recoated |
| Inspection | Fluorescent penetrant, X-ray |
| Service interval | 24000 hrsmade to order: 32000 hrs |
| Documentation | Material and heat certificates |