Catalogue / Gas turbines

No photo yet

Mid-size gas turbine for CHP, Core 3 seriesSample

by Lonavalavajra Gas Power Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Lonavalavajra Gas Power Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Mid-size gas turbine for CHP from Lonavalavajra, Core 3 series: 5 ISO rating options between 1 MW and 50 MW. Key features: black start capable, compact package with acoustic enclosure and combined cycle and CHP integration. Typically used for industrial cogeneration, combined cycle plants and oil and gas facilities. Designed and tested to ISO 3977, API 616 and IEC 60034-1. Lead time 18-26 months; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Lonavalavajra
Model
LON-1E3 series
Listing type
Product
Unit
nos
Minimum order
10 nos
Lead time
18-26 months
Warranty
24 months
Standards
ISO 3977, API 616, IEC 60034-1
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
FOR site, freight included
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
ISO rating1 MWLON-1E3-01ISO rating: 1 MW10 nos · 18-26 monthsfor verified buyers
ISO rating5 MWLON-1E3-02ISO rating: 5 MW10 nos · 18-26 monthsfor verified buyers
ISO rating15 MWLON-1E3-03ISO rating: 15 MW10 nos · 18-26 monthsfor verified buyers
ISO rating30 MWLON-1E3-04ISO rating: 30 MW10 nos · 18-26 monthsfor verified buyers
ISO rating50 MWLON-1E3-05ISO rating: 50 MW10 nos · 18-26 monthsfor verified buyers

Specifications

ISO rating1 MW to 50 MW (see variants)
TypeIndustrialmade to order: Aeroderivative / Heavy-duty frame
FuelDual fuel gas / HSDmade to order: Natural gas / Syngas
Efficiency33%
Exhaust temperature480 Cmade to order: 540 C / 600 C
Pressure ratio10:1
NOx controlDLNmade to order: Water injection
Speed5000 rpm with gearbox
StartingStatic startmade to order: Diesel start
Combined cycle readyYes
Inlet filterMulti-stage with chiller option
EmissionsNOx <= 25 ppm

BARREL: Bharat Atom Renewable Resources Energy Limited