Catalogue / Waste-to-energy (incineration, RDF)

No photo yet

Waste-to-energy moving grate system, Ultra 8 seriesSample

by Lumentron Bio Energy (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Lumentron Bio Energy (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Lumentron Ultra 8 waste-to-energy moving grate system, offered in 3 plant capacity options from 100 TPD to 500 TPD. Highlights: steam turbine heat recovery, odour control through negative pressure bunker and bottom ash used in brick or road base. Typically used for municipal corporations, PPP waste-to-energy developers and industrial waste processors. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 18-24 months; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Lumentron
Model
LUM-A73 series
Listing type
Product
Unit
lot
Minimum order
2 lot
Lead time
18-24 months
Warranty
24 months
Standards
SWM Rules 2016, CPCB emission norms, IBR 1950
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
Ex-works, freight extra at actuals
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity100 TPDLUM-A73-01Plant capacity: 100 TPD2 lot · 18-24 monthsfor verified buyers
Plant capacity300 TPDLUM-A73-02Plant capacity: 300 TPD2 lot · 18-24 monthsfor verified buyers
Plant capacity500 TPDLUM-A73-03Plant capacity: 500 TPD2 lot · 18-24 monthsfor verified buyers

Specifications

Plant capacity100 TPD to 500 TPD (see variants)
TechnologyFluidised bedmade to order: Moving grate / Gasification
FuelMSWmade to order: RDF / Industrial waste
Calorific value2500 kcal/kgmade to order: 1500 kcal/kg / 3200 kcal/kg
Steam parameters42 bar / 400 C
Power output20 MWmade to order: 3 MW / 10 MW
Flue gas cleaningSNCR, lime, bag filter, activated carbon
Residence time> 2 s at 850 C
Ash handlingWet bottom ash extractor
Dioxin controlActivated carbon injection
MonitoringCEMS online to CPCB
Design life25 years

BARREL: Bharat Atom Renewable Resources Energy Limited