Catalogue / Third-party inspection (TPI)
Cable drum inspection and sampling, Core 5 seriesSample
by Maduraisurya Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maduraisurya Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Maduraisurya Core 5 cable drum inspection and sampling, offered in 4 inspection effort options from 1 man-day to 20 man-days. Key features: quick mobilisation across India, photographic evidence of each inspection and independent opinion for buyers. Used by EPC contractors and developers, government procurement and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maduraisurya
- Model
- MAD-214 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayMAD-214-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort5 man-daysMAD-214-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort10 man-daysMAD-214-03 | Inspection effort: 10 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort20 man-daysMAD-214-04 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 1 man-day to 20 man-days (see variants) |
|---|---|
| Equipment inspected | Towers and structuresmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters |
| Inspection stage | Raw materialmade to order: In-process / Final pre-dispatch |
| Standards used | Per approved QAPmade to order: Per client specification |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | Empanelled inspection agency |
| Report | Detailed report with photos in 48 hoursmade to order: Inspection release note |
| Coverage | Pan India |
| Sampling | As per IS 2500made to order: AQL level II |
| Release note | Hard copy plus scan |
| Travel | At actualsmade to order: Included in rate |