Catalogue / Third-party inspection (TPI)

No photo yet

Cable drum inspection and sampling, Edge seriesSample

by Maduraisurya Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Maduraisurya Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Cable drum inspection and sampling from Maduraisurya, Edge series: 4 inspection effort options between 5 man-days and 50 man-days. Key features: hold and witness points per QAP, photographic evidence of each inspection and calibration check of test equipment. Used by government procurement, EPC contractors and developers and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Maduraisurya
Model
MAD-213 series
Listing type
Service
Unit
day
Minimum order
1 day
Lead time
Report in 24-48 hours
Warranty
Re-inspection at no cost for disputed lots
Standards
ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
Delivers to
All India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Inspection effort5 man-daysMAD-213-01Inspection effort: 5 man-days1 day · Report in 24-48 hourson quote
Inspection effort10 man-daysMAD-213-02Inspection effort: 10 man-days1 day · Report in 24-48 hourson quote
Inspection effort20 man-daysMAD-213-03Inspection effort: 20 man-days1 day · Report in 24-48 hourson quote
Inspection effort50 man-daysMAD-213-04Inspection effort: 50 man-days1 day · Report in 24-48 hourson quote

Specifications

Inspection effort5 man-days to 50 man-days (see variants)
Equipment inspectedSwitchgear and relays
Inspection stageFinal pre-dispatchmade to order: Raw material / In-process
Standards usedPer client specificationmade to order: Per approved QAP
Inspector qualificationLevel II NDT certifiedmade to order: B.E. Electrical with 8 years experience
AccreditationEmpanelled inspection agency
ReportDetailed report with photos in 48 hoursmade to order: Inspection release note
CoverageDomestic and export vendorsmade to order: Pan India
SamplingAQL level II
Release noteHard copy plus scanmade to order: Digital signature
TravelAt actualsmade to order: Included in rate

BARREL: Bharat Atom Renewable Resources Energy Limited