Catalogue / Third-party inspection (TPI)
Cable drum inspection and sampling, Edge seriesSample
by Maduraisurya Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maduraisurya Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Cable drum inspection and sampling from Maduraisurya, Edge series: 4 inspection effort options between 5 man-days and 50 man-days. Key features: hold and witness points per QAP, photographic evidence of each inspection and calibration check of test equipment. Used by government procurement, EPC contractors and developers and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maduraisurya
- Model
- MAD-213 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report in 24-48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort5 man-daysMAD-213-01 | Inspection effort: 5 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort10 man-daysMAD-213-02 | Inspection effort: 10 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort20 man-daysMAD-213-03 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort50 man-daysMAD-213-04 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 5 man-days to 50 man-days (see variants) |
|---|---|
| Equipment inspected | Switchgear and relays |
| Inspection stage | Final pre-dispatchmade to order: Raw material / In-process |
| Standards used | Per client specificationmade to order: Per approved QAP |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | Empanelled inspection agency |
| Report | Detailed report with photos in 48 hoursmade to order: Inspection release note |
| Coverage | Domestic and export vendorsmade to order: Pan India |
| Sampling | AQL level II |
| Release note | Hard copy plus scanmade to order: Digital signature |
| Travel | At actualsmade to order: Included in rate |