Catalogue / Factory acceptance test (FAT) witnessing
FAT for GIS and switchgear, Xtra seriesSample
by Maduraisurya Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maduraisurya Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
FAT for GIS and switchgear from Maduraisurya, Xtra series: 3 equipment value options between INR 5 crore and INR 25 crore. Design: handover to dispatch inspection, test curves and data captured and independent and impartial witness. Typically used for lender acceptance, EPC and OEM contracts and BESS projects. Delivered in line with IEC 60076, IEC 62271 and IEC 62109. Mobilisation Report within 2 days of test; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maduraisurya
- Model
- MAD-171 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report within 2 days of test
- Warranty
- Re-witness at no cost if protocol changes
- Standards
- IEC 60076, IEC 62271, IEC 62109
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Equipment valueINR 5 croreMAD-171-01 | Equipment value: INR 5 crore | 1 day · Report within 2 days of test | on quote |
| Equipment valueINR 10 croreMAD-171-02 | Equipment value: INR 10 crore | 1 day · Report within 2 days of test | on quote |
| Equipment valueINR 25 croreMAD-171-03 | Equipment value: INR 25 crore | 1 day · Report within 2 days of test | on quote |
Specifications
| Equipment value | INR 5 crore to INR 25 crore (see variants) |
|---|---|
| Test plan | Based on tender specification |
| Tests witnessed | Routine tests per IS or IEC |
| Team | Specialist engineers per discipline |
| Location | International factory |
| Documentation review | Full documentation checkmade to order: Drawing, QAP and test certificate review |
| Deliverable | FAT report with release note |
| Remote witness | Physical only |
| Turnaround | 3-5 daysmade to order: 24-48 hours |
| Hold points | Per ITP |
| Travel | Extra at actualsmade to order: Included |