Catalogue / Electrical safety audits

No photo yet

Safety audit for solar plants and substations, Neo seriesSample

by Maduraisurya Technical Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Maduraisurya Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Safety audit for solar plants and substations from Maduraisurya, Neo series: 5 installed load options between 500 kVA and 25 MVA. Design: earthing health and soil resistivity, risk-ranked findings and fire exit and detection checks. Used by solar and wind sites, manufacturing plants and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Maduraisurya
Model
MAD-883 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Clarifications on report at no cost for 6 months
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load500 kVAMAD-883-01Installed load: 500 kVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load1 MVAMAD-883-02Installed load: 1 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load5 MVAMAD-883-03Installed load: 5 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load10 MVAMAD-883-04Installed load: 10 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load25 MVAMAD-883-05Installed load: 25 MVA1 site · Report in 7-14 daysfor verified buyers

Specifications

Installed load500 kVA to 25 MVA (see variants)
ScopeAudit with measurements
AuditorChartered engineermade to order: CEA-licensed engineer
MeasurementsThermography and power quality
ReportAction plan with timeline
Statutory recordsRegisters, test certificates, licence
SamplingRepresentative LV panels
Follow-upRe-audit after 3 monthsmade to order: Close-out verification
Turnaround3-4 weeks
PresentationFindings to managementmade to order: Report only
AccreditationISO/IEC 17020 bodymade to order: Government recognised agency

BARREL: Bharat Atom Renewable Resources Energy Limited