Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Site acceptance testing for solar plants, Titan seriesSample

by Maduraisurya Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Maduraisurya Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Maduraisurya Titan site acceptance testing for solar plants, offered in 6 plant size options from 1 MW to 100 MW. Key features: final dossier for handover, thermography prior to energisation and instrument calibration certificates. Suited to industrial substations, renewable parks and EPC handover. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation Mobilisation in 3-7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Maduraisurya
Model
MAD-248 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Mobilisation in 3-7 days
Warranty
Report accuracy guaranteed
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size1 MWMAD-248-01Plant size: 1 MW1 site · Mobilisation in 3-7 dayson quote
Plant size5 MWMAD-248-02Plant size: 5 MW1 site · Mobilisation in 3-7 dayson quote
Plant size10 MWMAD-248-03Plant size: 10 MW1 site · Mobilisation in 3-7 dayson quote
Plant size25 MWMAD-248-04Plant size: 25 MW1 site · Mobilisation in 3-7 dayson quote
Plant size50 MWMAD-248-05Plant size: 50 MW1 site · On-site 3-21 dayson quote
Plant size100 MWMAD-248-06Plant size: 100 MW1 site · On-site 3-21 dayson quote

Specifications

Plant size1 MW to 100 MW (see variants)
ScopeSolar SAT
InstrumentsInsulation tester, earth tester
Test sequencePer client approved formatmade to order: Visual, mechanical, electrical
TeamTeam of 6 with leadmade to order: Test engineer plus 2 technicians
Duration on site3-5 daysmade to order: 10 days / 3 weeks
ReportsDigital dossier with photos
CalibrationNABL traceablemade to order: Calibration certificates attached
Witnessed byClient engineer
Retest policyOne retest included
Payment50% advance

BARREL: Bharat Atom Renewable Resources Energy Limited