Catalogue / Electrical safety audits
Safety audit for solar plants and substations, Edge seriesSample
by Maduraisurya Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maduraisurya Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Edge service of safety audit for solar plants and substations by Maduraisurya covers 4 installed load options (5 MVA to 50 MVA). Highlights: earthing health and soil resistivity, compliance matrix against CEA safety rules and risk-ranked findings. Typically used for solar and wind sites, hospitals and commercial buildings and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maduraisurya
- Model
- MAD-887 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load5 MVAMAD-887-01 | Installed load: 5 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load10 MVAMAD-887-02 | Installed load: 10 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load25 MVAMAD-887-03 | Installed load: 25 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load50 MVAMAD-887-04 | Installed load: 50 MVA | 1 site · Report in 7-14 days | on quote |
Specifications
| Installed load | 5 MVA to 50 MVA (see variants) |
|---|---|
| Scope | Audit with arc-flash study |
| Auditor | CEA-licensed engineermade to order: Chartered engineer |
| Measurements | Earth resistance, insulation |
| Report | Action plan with timeline |
| Statutory records | Registers, test certificates, licencemade to order: Permit-to-work audit |
| Sampling | Representative LV panelsmade to order: 100% of HV equipment |
| Follow-up | Close-out verification |
| Turnaround | 1-2 weeksmade to order: 3-4 weeks |
| Presentation | Findings to management |
| Accreditation | ISO/IEC 17020 body |