Catalogue / Furnace & rectifier transformers

No photo yet

Electric arc furnace transformer, Core seriesSample

by Madurai Transformer Works (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Madurai Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Madurai Core electric arc furnace transformer, offered in 6 rating options from 5 MVA to 100 MVA. Key features: high current LV bus design, rigid winding clamping and heavy-duty OLTC for many operations per day. Used by aluminium smelters, chlor-alkali and green hydrogen electrolysers. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 16-20 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Madurai
Model
MAD-2B1 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
16-20 weeks
Warranty
24 months
Standards
IS 2026, IEC 60076, IEC 61378-1
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
FOR site, freight included
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating5 MVAMAD-2B1-01Rating: 5 MVA1 nos · 16-20 weeksfor verified buyers
Rating10 MVAMAD-2B1-02Rating: 10 MVA1 nos · 16-20 weeksfor verified buyers
Rating20 MVAMAD-2B1-03Rating: 20 MVA1 nos · 16-20 weeksfor verified buyers
Rating40 MVAMAD-2B1-04Rating: 40 MVA1 nos · 16-20 weeksfor verified buyers
Rating60 MVAMAD-2B1-05Rating: 60 MVA1 nos · 28-36 weeksfor verified buyers
Rating100 MVAMAD-2B1-06Rating: 100 MVA1 nos · 28-36 weeksfor verified buyers

Specifications

Rating5 MVA to 100 MVA (see variants)
Primary voltage66 kVmade to order: 11 kV / 33 kV / 132 kV
Secondary voltageUp to 400 V DC rectifiedmade to order: Up to 1000 V
ApplicationLRF
CoolingONAN/ONAF
Tap changerOLTC
Secondary tapsUp to 21 steps
Vector groupDd0
Overload20% for 2 hours
Impedance8%
ReactorExternal
BushingsHigh-current plate type
MonitoringOnline DGA optional

BARREL: Bharat Atom Renewable Resources Energy Limited