Catalogue / Feasibility studies & DPR
Techno-commercial feasibility study for solar projects, Ultra seriesSample
by Maduraividyut Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maduraividyut Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Ultra service of techno-commercial feasibility study for solar projects by Maduraividyut covers 4 project capacity options (10 MW to 500 MW). Key features: alternative configuration comparison, risk register with mitigations and capex and opex benchmarks for Indian market. Typically used for developers and IPPs, industrial captive consumers and funds and lenders. Delivered in line with MNRE Guidelines, CERC Tariff Regulations and IEC 61724-1. Mobilisation 3-12 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maduraividyut
- Model
- MAD-231 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 3-12 weeks
- Warranty
- As per contract
- Standards
- MNRE Guidelines, CERC Tariff Regulations, IEC 61724-1
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project capacity10 MWMAD-231-01 | Project capacity: 10 MW | 1 report · 3-12 weeks | on quote |
| Project capacity50 MWMAD-231-02 | Project capacity: 50 MW | 1 report · 3-12 weeks | on quote |
| Project capacity100 MWMAD-231-03 | Project capacity: 100 MW | 1 report · 3-12 weeks | on quote |
| Project capacity500 MWMAD-231-04 | Project capacity: 500 MW | 1 report · 3-12 weeks | on quote |
Specifications
| Project capacity | 10 MW to 500 MW (see variants) |
|---|---|
| Scope | Bankable DPR |
| Energy yield | PVsyst P50/P90made to order: WAsP wind energy assessment |
| Financial model | Sensitivity and tariff analysis |
| Grid assessment | Nearest substation capacity check |
| Site visit | Two visits with geotechmade to order: One visit with drone survey |
| Environmental screening | Includedmade to order: Optional add-on |
| Team | Multi-disciplinary team of 5made to order: Lead consultant and analyst |
| Turnaround | 6-8 weeks |
| Deliverable | Report, model and presentation |
| Review rounds | Two with client comments |