Catalogue / Power system studies (load flow, short circuit, grid code)
Load flow and short-circuit study, Flex seriesSample
by Maduraividyut Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maduraividyut Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Load flow and short-circuit study from Maduraividyut, Flex series: 3 network scale options between 132 kV system and 400 kV system. Design: fault level verification of switchgear, reactive power capability curves and models acceptable to STU and CTUIL. Suited to renewable developers seeking connectivity, BESS integrators and industrial plants adding generation. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maduraividyut
- Model
- MAD-467 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 2-6 weeks
- Warranty
- Revision for utility comments
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale132 kV systemMAD-467-01 | Network scale: 132 kV system | 1 report · 2-6 weeks | on quote |
| Network scale220 kV systemMAD-467-02 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
| Network scale400 kV systemMAD-467-03 | Network scale: 400 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 132 kV system to 400 kV system (see variants) |
|---|---|
| Study type | Dynamic and transient |
| Software | ETAPmade to order: PSS/E / DIgSILENT PowerFactory |
| Model data | Utility network model |
| Deliverables | Model files and relay settingsmade to order: Study report with results |
| Grid code checks | Voltage and reactive power capability |
| Review | Lender review |
| Scenarios | Multiple dispatch cases |
| Team | Lead plus modelling specialist |
| Turnaround | 4-6 weeks |
| Validation | Compared with measured data |