Catalogue / Power system studies (load flow, short circuit, grid code)
Load flow and short-circuit study, Duo seriesSample
by Maduraividyut Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maduraividyut Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Duo service of load flow and short-circuit study by Maduraividyut covers 6 network scale options (11 kV plant to 400 kV system). Highlights: PSS/E and PSCAD model support, reactive power capability curves and fault level verification of switchgear. Used by industrial plants adding generation, renewable developers seeking connectivity and BESS integrators. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maduraividyut
- Model
- MAD-469 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 2-6 weeks
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantMAD-469-01 | Network scale: 11 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale33 kV plantMAD-469-02 | Network scale: 33 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale66 kV systemMAD-469-03 | Network scale: 66 kV system | 1 report · 2-6 weeks | on quote |
| Network scale132 kV systemMAD-469-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | on quote |
| Network scale220 kV systemMAD-469-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
| Network scale400 kV systemMAD-469-06 | Network scale: 400 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 11 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Protection coordination |
| Software | DIgSILENT PowerFactory |
| Model data | Utility network model |
| Deliverables | Model files and relay settings |
| Grid code checks | Voltage and reactive power capability |
| Review | Lender reviewmade to order: Utility submission support |
| Scenarios | Multiple dispatch cases |
| Team | Power system engineer |
| Turnaround | 2-3 weeksmade to order: 4-6 weeks |
| Validation | Peer review |