Catalogue / Third-party inspection (TPI)
Civil and structural stage inspection, Titan 4 seriesSample
by Maduraividyut Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maduraividyut Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Civil and structural stage inspection from Maduraividyut, Titan 4 series: 4 inspection effort options between 5 man-days and 50 man-days. Key features: calibration check of test equipment, quick mobilisation across India and non-conformity reports with closure tracking. Suited to lender quality assurance, utilities and PSUs and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maduraividyut
- Model
- MAD-969 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report in 24-48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort5 man-daysMAD-969-01 | Inspection effort: 5 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort10 man-daysMAD-969-02 | Inspection effort: 10 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort20 man-daysMAD-969-03 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort50 man-daysMAD-969-04 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 5 man-days to 50 man-days (see variants) |
|---|---|
| Equipment inspected | Cables and conductorsmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters |
| Inspection stage | In-processmade to order: Raw material / Final pre-dispatch |
| Standards used | Per approved QAP |
| Inspector qualification | B.E. Electrical with 8 years experiencemade to order: Level II NDT certified |
| Accreditation | Empanelled inspection agency |
| Report | Detailed report with photos in 48 hours |
| Coverage | Domestic and export vendors |
| Sampling | As per IS 2500 |
| Release note | Digital signature |
| Travel | Included in ratemade to order: At actuals |