Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Cable and insulation resistance testing, Pro 5 seriesSample

by Maduraividyut Technical Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Maduraividyut Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Pro 5 service of cable and insulation resistance testing by Maduraividyut covers 4 plant size options (25 MW to 250 MW). Key features: thermography prior to energisation, support to CEIG inspection and instrument calibration certificates. Used by EPC handover, renewable parks and lender completion. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation Mobilisation in 3-7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Maduraividyut
Model
MAD-C62 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Mobilisation in 3-7 days
Warranty
Retest at no cost on instrument error
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
All India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size25 MWMAD-C62-01Plant size: 25 MW1 site · Mobilisation in 3-7 daysfor verified buyers
Plant size50 MWMAD-C62-02Plant size: 50 MW1 site · Mobilisation in 3-7 daysfor verified buyers
Plant size100 MWMAD-C62-03Plant size: 100 MW1 site · On-site 3-21 daysfor verified buyers
Plant size250 MWMAD-C62-04Plant size: 250 MW1 site · On-site 3-21 daysfor verified buyers

Specifications

Plant size25 MW to 250 MW (see variants)
ScopeElectrical pre-commissioningmade to order: Solar SAT / Complete SAT with performance test
InstrumentsInsulation tester, earth testermade to order: Relay test set, IV tracer, CRM
Test sequenceVisual, mechanical, electrical
TeamTest engineer plus 2 technicians
Duration on site3-5 daysmade to order: 10 days / 3 weeks
ReportsTest results on approved formatsmade to order: Digital dossier with photos
CalibrationCalibration certificates attached
Witnessed byLender engineer or authoritymade to order: Client engineer
Retest policyOne retest included
PaymentOn completion of report

BARREL: Bharat Atom Renewable Resources Energy Limited