Catalogue / Electrical safety audits
Earthing and lightning protection audit, Elite seriesSample
by Maduraividyut Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maduraividyut Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Elite service of earthing and lightning protection audit by Maduraividyut covers 5 installed load options (500 kVA to 25 MVA). Design: fire exit and detection checks, risk-ranked findings and training recommendations for staff. Suited to data centres, manufacturing plants and solar and wind sites. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maduraividyut
- Model
- MAD-5F9 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Re-audit at reduced rate
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load500 kVAMAD-5F9-01 | Installed load: 500 kVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load1 MVAMAD-5F9-02 | Installed load: 1 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load5 MVAMAD-5F9-03 | Installed load: 5 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load10 MVAMAD-5F9-04 | Installed load: 10 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load25 MVAMAD-5F9-05 | Installed load: 25 MVA | 1 site · Report in 7-14 days | on quote |
Specifications
| Installed load | 500 kVA to 25 MVA (see variants) |
|---|---|
| Scope | Visual and documentation audit |
| Auditor | CEA-licensed engineer |
| Measurements | Thermography and power qualitymade to order: Earth resistance, insulation |
| Report | Action plan with timeline |
| Statutory records | Registers, test certificates, licencemade to order: Permit-to-work audit |
| Sampling | Representative LV panelsmade to order: 100% of HV equipment |
| Follow-up | Re-audit after 3 monthsmade to order: Close-out verification |
| Turnaround | 3-4 weeksmade to order: 1-2 weeks |
| Presentation | Findings to management |
| Accreditation | ISO/IEC 17020 bodymade to order: Government recognised agency |