Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Satellite based long-term solar irradiance study, Duo 2 seriesSample

by Maduraividyut Technical Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Maduraividyut Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Satellite based long-term solar irradiance study from Maduraividyut, Duo 2 series: 4 measurement duration options between 6 months and 24 months. Highlights: data quality control and filling, loss factors for local conditions and turbine and module selection input. Used by hybrid project planners, lenders needing P90 and wind and solar developers. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Maduraividyut
Model
MAD-B59 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
Data availability guarantee above 95%
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement duration6 monthsMAD-B59-01Measurement duration: 6 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration12 monthsMAD-B59-02Measurement duration: 12 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration18 monthsMAD-B59-03Measurement duration: 18 months1 report · Campaign 3-24 monthsfor verified buyers
Measurement duration24 monthsMAD-B59-04Measurement duration: 24 months1 report · Campaign 3-24 monthsfor verified buyers

Specifications

Measurement duration6 months to 24 months (see variants)
TechnologyWindmade to order: Solar GHI/DNI / Small hydro
Data sourceHybrid with MCP
EquipmentClass A pyranometer station
UncertaintyBankable assessmentmade to order: P50/P90 with uncertainty budget
ModellingPVsyst, SAMmade to order: WAsP, WindPRO
DeliverableHourly time series datasetmade to order: Resource report
CalibrationCalibration pre and post campaignmade to order: Traceable calibration
Site countMulti-site comparisonmade to order: Single site
MaintenanceQuarterly site visit
TurnaroundReport within 6 weeks of data

BARREL: Bharat Atom Renewable Resources Energy Limited