Catalogue / Electrical safety audits
Earthing and lightning protection audit, Core seriesSample
by Maduraividyut Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Maduraividyut Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Maduraividyut Core earthing and lightning protection audit, offered in 4 installed load options from 5 MVA to 50 MVA. Highlights: fire exit and detection checks, photographic evidence of non-compliances and compliance matrix against CEA safety rules. Used by manufacturing plants, data centres and hospitals and commercial buildings. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Maduraividyut
- Model
- MAD-5F9 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load5 MVAMAD-5F9-01 | Installed load: 5 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load10 MVAMAD-5F9-02 | Installed load: 10 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load25 MVAMAD-5F9-03 | Installed load: 25 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load50 MVAMAD-5F9-04 | Installed load: 50 MVA | 1 site · Report in 7-14 days | on quote |
Specifications
| Installed load | 5 MVA to 50 MVA (see variants) |
|---|---|
| Scope | Audit with measurements |
| Auditor | Chartered engineermade to order: CEA-licensed engineer |
| Measurements | Thermography and power qualitymade to order: Earth resistance, insulation |
| Report | Findings with risk ratingmade to order: Action plan with timeline |
| Statutory records | Permit-to-work auditmade to order: Registers, test certificates, licence |
| Sampling | 100% of HV equipmentmade to order: Representative LV panels |
| Follow-up | Re-audit after 3 months |
| Turnaround | 1-2 weeksmade to order: 3-4 weeks |
| Presentation | Findings to managementmade to order: Report only |
| Accreditation | Government recognised agencymade to order: ISO/IEC 17020 body |