Catalogue / Substation & line O&M
Switchyard preventive maintenance, Plus 8 seriesSample
by Magadh Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Magadh Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Plus 8 service of switchyard preventive maintenance by Magadh covers 5 voltage level options (11 kV to 220 kV). Highlights: insulator and joint inspection, permit-to-work and lockout-tagout and licensed supervisory staff. Used by railway and metro sub-stations, renewable pooling substations and industrial captive substations. Delivered in line with CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations and IS 10028 (Transformer Installation). Mobilisation Baseline condition audit first; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Magadh
- Model
- MAG-8E7 series
- Listing type
- Service
- Unit
- month
- Minimum order
- 1 month
- Lead time
- Baseline condition audit first
- Warranty
- As per contract
- Standards
- CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations, IS 10028 (Transformer Installation)
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level11 kVMAG-8E7-01 | Voltage level: 11 kV | 1 month · Baseline condition audit first | for verified buyers |
| Voltage level33 kVMAG-8E7-02 | Voltage level: 33 kV | 1 month · Baseline condition audit first | for verified buyers |
| Voltage level66 kVMAG-8E7-03 | Voltage level: 66 kV | 1 month · Baseline condition audit first | for verified buyers |
| Voltage level132 kVMAG-8E7-04 | Voltage level: 132 kV | 1 month · Baseline condition audit first | for verified buyers |
| Voltage level220 kVMAG-8E7-05 | Voltage level: 220 kV | 1 month · Baseline condition audit first | for verified buyers |
Specifications
| Voltage level | 11 kV to 220 kV (see variants) |
|---|---|
| Scope | Operation, maintenance and statutory compliancemade to order: Operation and maintenance / Maintenance only |
| Shift pattern | General shift plus on-call |
| Manpower | Engineer plus 6 operators |
| Line patrolling | Monthly foot patrolmade to order: Quarterly drone patrol |
| Testing | Thermography twice a year |
| Statutory records | CEIG renewal support |
| Spares | Critical spares by owner |
| Response time | 2 hours for trip |
| Reporting | Monthly fault and maintenance reportmade to order: Real-time dashboards |
| Term | 1 yearmade to order: 3 years |