Catalogue / Power system studies (load flow, short circuit, grid code)

No photo yet

Dynamic stability and fault ride-through study, Prime seriesSample

by Magadh Engineering Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Magadh Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Prime service of dynamic stability and fault ride-through study by Magadh covers 3 network scale options (33 kV plant to 132 kV system). Design: models acceptable to STU and CTUIL, fault level verification of switchgear and relay setting files ready to load. Used by industrial plants adding generation, renewable developers seeking connectivity and utilities and consultants. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Magadh
Model
MAG-5E5 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
2-6 weeks
Warranty
Clarifications to utility at no cost
Standards
CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
Delivers to
North India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Network scale33 kV plantMAG-5E5-01Network scale: 33 kV plant1 report · 2-6 weeksfor verified buyers
Network scale66 kV systemMAG-5E5-02Network scale: 66 kV system1 report · 2-6 weeksfor verified buyers
Network scale132 kV systemMAG-5E5-03Network scale: 132 kV system1 report · 2-6 weeksfor verified buyers

Specifications

Network scale33 kV plant to 132 kV system (see variants)
Study typeProtection coordination
SoftwarePSS/E
Model dataUtility network model
DeliverablesStudy report with resultsmade to order: Model files and relay settings
Grid code checksVoltage and reactive power capability
ReviewUtility submission support
ScenariosMultiple dispatch casesmade to order: Normal and N-1
TeamLead plus modelling specialistmade to order: Power system engineer
Turnaround2-3 weeksmade to order: 4-6 weeks
ValidationPeer review

BARREL: Bharat Atom Renewable Resources Energy Limited