Catalogue / Substation & line O&M
Battery bank and DC system maintenance, Flex seriesSample
by Magadh Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Magadh Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Magadh Flex battery bank and DC system maintenance, offered in 6 voltage level options from 11 kV to 400 kV. Key features: insulator and joint inspection, licensed supervisory staff and fault analysis within 24 hours. Used by renewable pooling substations, industrial captive substations and state utility outsourcing. Delivered in line with CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations and IS 10028 (Transformer Installation). Mobilisation Baseline condition audit first; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Magadh
- Model
- MAG-CB8 series
- Listing type
- Service
- Unit
- month
- Minimum order
- 1 month
- Lead time
- Baseline condition audit first
- Warranty
- As per contract
- Standards
- CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations, IS 10028 (Transformer Installation)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level11 kVMAG-CB8-01 | Voltage level: 11 kV | 1 month · Baseline condition audit first | on quote |
| Voltage level33 kVMAG-CB8-02 | Voltage level: 33 kV | 1 month · Baseline condition audit first | on quote |
| Voltage level66 kVMAG-CB8-03 | Voltage level: 66 kV | 1 month · Baseline condition audit first | on quote |
| Voltage level132 kVMAG-CB8-04 | Voltage level: 132 kV | 1 month · Baseline condition audit first | on quote |
| Voltage level220 kVMAG-CB8-05 | Voltage level: 220 kV | 1 month · Baseline condition audit first | on quote |
| Voltage level400 kVMAG-CB8-06 | Voltage level: 400 kV | 1 month · Baseline condition audit first | on quote |
Specifications
| Voltage level | 11 kV to 400 kV (see variants) |
|---|---|
| Scope | Operation, maintenance and statutory compliance |
| Shift pattern | 3 shifts, 24x7made to order: General shift plus on-call |
| Manpower | Engineer plus 6 operators |
| Line patrolling | Quarterly drone patrol |
| Testing | Thermography twice a year |
| Statutory records | CEIG renewal support |
| Spares | Consumables includedmade to order: Critical spares by owner |
| Response time | 4 hoursmade to order: 2 hours for trip |
| Reporting | Monthly fault and maintenance reportmade to order: Real-time dashboards |
| Term | 3 yearsmade to order: 1 year |